Left edge of tabHelpful LinksRight edge of tab
Left edge of tabNews ArchivesRight edge of tab
Left edge of tabPBCFR Department NewsRight edge of tab
Slideshow image: IMG_0304.JPG
Slideshow image #1 of 4

Previous pictureZoom pictureView all imagesPause slideshowNext picture

Station 32: The Reconstruction (Part 3)

Story and photos by Drew Craig, E32-B
Palm Beach County, Florida
December 1st , 2009

Progress is moving along quite well over at the "32 House". The second floor is poured, the second floor walls are up, next will be the roof trussess and the roof. Everything looks to be going as planned, however we did notice a change to the plans. Nope, no addition of a pole... The second story balcony/patio has been removed, we've been told that its been blocked in (CBS) and it will now house a 5x7 window instead of an actual patio. There is a proof of the stucco pattern on the delta side of the structure, however the pictures didn't come out clear. It is a nice pattern, it's a tight stucco pattern. There were three styles of stucco patterns to choose from, wide stucco, medium stucco , and tight stucco  patterns. Don't know who chose the pattern, but it looks great we're pleased with it. Thats all for now, more pics will come soon. We heard the roof is going up within the next couple of weeks. Until then be good be safe.

***


All articles ©2006, all rights reserved. If you would like to reproduce or reprint any articles or images, in whole or part, please contact the Public Informations Officer.